Clash detection
BIM Services
FAQs
Clash detection identifies conflicts between structural, architectural, and MEP elements in 3D models before construction begins, reducing costly on-site issues.
Point clouds reflect real as-built conditions, allowing accurate detection of clashes that are often missed when using outdated drawings.
Renovation projects involve existing constraints, and clash detection helps avoid unexpected conflicts with hidden services and structures.
By resolving conflicts during the design stage, clash detection prevents on-site rework, material wastage, and schedule delays.
Yes, scan-based 3D models enable reliable clash detection in tight and congested plant environments where space is limited.
It ensures new systems integrate smoothly with existing assets by identifying spatial conflicts before installation.
Clash detection covers architecture, structure, HVAC, piping, electrical, and fire-fighting systems within a coordinated model.
Clash detection is performed using BIM software integrated with scan-based models and point cloud data.
Deliverables include clash reports, coordination models, issue logs, and revised models for construction readiness.
It creates a shared coordination platform, improving communication between designers, engineers, and contractors.